Project Overview

Complete installation of an 8 section prefabricated Amenity Block building and a 4 section prefabricated Office Block.

Construction process

The timber framed modular building delivered and installed to this unique site in Belfast . We were responsible for the structural, mechanical and electrical design and certification of timber framed modular building complex.
The modular building complex consisted of 32 bed student accommodation, student shower blocks, canteens and teacher accommodation. The building construction was a joisted structural timber floor, external timber studs with a plasticol steel cladding system.

Handover

The project was fully commissioned and handed without any delays.